For industrial gas companies and EPCs

Welded to your spec. Handed over with the paperwork.

BRS installs high-purity gas systems, orbital-welded stainless tube, tool hook-up and plant piping for the industrial gas companies and EPC contractors that hold the main contract. Your specification, your test plan, your permit schedule. Our crew, our machines, and the dossier at the end.

Contracting
Supply-and-install, or install-only on your materials.
Core scope
Orbital GTAW on stainless tube, tool hook-up, VMBs and gas cabinets, plant piping.
Based
Office in Imus City, Cavite. Fabrication shop in Biñan, Laguna.

Capabilities

What we can do.

What our crews and our Biñan shop are set up to deliver, as a subcontract package under your contract or as a standalone scope. Gas systems first; the rest of the package after that.

High-purity and specialty gas systems

  • Main-source to sub-distribution gas piping
  • Specialty gas piping
  • Valve manifold box installation
  • Cleanroom gas-stick piping
  • Tool hook-up above the plenum and at cleanroom level
  • Gas-cabinet source hook-up
  • Gas-mixing equipment and backup supply piping
  • Vacuum and bulk-gas piping

Orbital welding

  • Automated orbital GTAW on stainless tube for ultra-high-purity service
  • Written welding methodology and certified welders
  • Third-party radiographic and dye penetrant testing
  • Weld coupon checked before production welds run
  • BRS-owned machines, weld heads and facing tools
Orbital welding in detail

Plant, process and utility piping

  • Nitrogen plant mechanical piping
  • Bulk nitrogen supply facilities
  • Auto-switchover manifolds and mixed-gas supply piping
  • Vacuum-insulated pipeline for cryogenic service
  • Chemical piping
  • Clean-in-place and simple-syrup process lines
  • Ducting installation
  • Fire-protection pipeline and hose-cabinet work

Testing and commissioning

  • Helium leak testing on VMB gas sticks and tool hook-up lines
  • Moisture and oxygen content analysis
  • Particle-count analysis at cleanroom level
  • Nitrogen purging on commissioned lines and vessels
Testing and handover

Fabrication and supply

  • Gas panel skids fabricated in the shop
  • Tool fabrication
  • Industrial products and instrument fittings

Electrical, civil and structural

  • Cable pulling, equipment positioning, line tracing and termination
  • Tank foundations and tank erection
  • Building and steel-structure work
All services

Contracting modes

We quote either way.

Both modes are available on every scope. Say which one your contract runs on and the quote is built to it.

Supply-and-install
BRS sources the materials to your specification and installs them. One subcontract carries the material schedule, the deliveries and the installation.
Install-only
You or your EPC supply the materials. BRS is paid for labour, equipment and consumables, and installs to the same methodology and test plan.

Orbital welding

Fewer joints, fewer leak paths, lower installed cost.

Every mechanical fitting is a part to buy, a joint to make up and a leak path to test. Welding the tube runs costs less than multiplying NPT and compression fittings across a system, and it leaves fewer places for the system to fail.

  • Automated orbital GTAW on stainless tube for ultra-high-purity gas systems.
  • Written methodology and welder competency certification.
  • Third-party NDT, radiographic and dye penetrant.
  • BRS-owned equipment: orbital machines, weld heads and facing tools.
Mirror-finish interior bore of an orbital weld coupon, showing a smooth and even penetration bead
A coupon cut from the setup weld. The bore and the heat tint are checked before production welds run.

Testing and handover

The dossier that closes your billing.

On a multi-trade site, one missing dossier holds up everyone's billing. We test what we install and hand over the package your client's acceptance runs on.

What we test

  • Helium leak testing for VMB gas sticks and tool hook-up lines
  • Moisture and oxygen content analysis
  • Particle-count analysis at cleanroom level
  • Nitrogen purging on commissioned lines and vessels

What you receive

As-built drawings
The system as installed, against the drawings you issued.
Test reports
Leak test, purity analysis and NDT results, in the format your acceptance requires.
Punchlists
Raised, tracked and closed out before handover.
Handover dossiers
Compiled so your own billing does not wait on ours.
Permit-to-Operate packages
Assembled for the permit application and the authority inspection.

Recent work

Recent installations.

Three from the fab side. The full set, with plant piping and supporting works, is on the projects page.

Orbital welding during an above-plenum semiconductor tool hook-up

Semiconductor fab

Base build, hook-up, and testing

VMB installation, gas cabinet connections, orbital-welded hook-ups, leak tests, and gas analysis.

See the project
Stainless bulk gas headers and bellows installed at a semiconductor fab

Semiconductor fab

Cleanroom distribution piping

Gas sticks, vacuum lines, and bulk gas distribution across the cleanroom.

See the project
Stainless gas supply piping and supports at a semiconductor fab

Semiconductor fab

MIP gas supply piping

Gas supply piping for MIP equipment facilitation.

See the project

Customers

Who we work for.

Industrial gas companies, semiconductor manufacturers and EPC contractors. Much of the fab-side work came to us as subcontracts from large industrial gas providers.

Coherent

Air Liquide

Nippon Sanso Ingasco

Microchip

Maxeon

Analog Devices

More customers

SunPower (SPML)

STMicroelectronics

onsemi

Nexperia

ROHM Semiconductor

Texas Instruments

Linde

ShinDengen

Kelington Engineering

First Sumiden Circuits

Lindberg

Littelfuse

Deca Technologies

Cirtek Electronics

PSi Technologies

Toshiba

HOYA

IMI

Enkei

Technowood

Liquigaz Philippines

Wu Kong (S) Pte. Ltd.

Amkor

Murata

Send us the scope.

Drawings, gases, service pressures, contracting mode, site, target dates, and the records you need at handover.

Request a quote