Gas from source to tool, then tested.
We installed the main gas cabinet, the valve manifold box, above-plenum routing, and the cleanroom tool connections, then ran the acceptance tests.
- Valve manifold box installation
- Gas cabinet and process-tool hook-ups
- Orbital welding above the plenum and in the cleanroom
- Helium leak testing
- Moisture and oxygen content analysis
- Particle count analysis