Project accomplishment
Twenty-five documented project scopes.
Photographed on site. Grouped by discipline — semiconductor and cleanroom gas work first, since that is where most of the work sits.
Semiconductor & cleanroom gas
High-purity gas piping, orbital welding, tool hook-up and purity verification inside operating fabs.
Valve manifold box (VMB) installation
VMB installation as part of the base build package for the MAXEON 7 and 8 fabs.
Gas supply tool hook-up above plenum, with orbital welding
Tool hook-up gas supply lines routed above the plenum, joined by orbital welding.
Gas supply tool hook-up at cleanroom level
Hook-up of gas supply to process tools within the cleanroom.
Tool hook-up with orbital welding in the cleanroom area
Orbital welded hook-up executed inside the cleanroom envelope.
Helium leak test — VMB gas stick and tool hook-up lines
Helium leak testing of completed VMB gas sticks and tool hook-up lines in the cleanroom area.
Moisture and oxygen content analysis
Moisture and O₂ content analysis on the tool hook-up lines before release to production.
Particle count analysis
Particle count analysis on tool hook-up lines at cleanroom level.
Gas supply hook-up at gas cabinet (main source)
Hook-up at the gas cabinet, the main source end of the distribution system.
N₂, O₂, Ar and CDA gas stick piping installation
Gas stick piping for nitrogen, oxygen, argon and compressed dry air in the Fab 2 cleanroom.
Vacuum line and bulk gas piping installation
Vacuum lines and bulk gas distribution piping installed in the Fab 2 cleanroom.
Gas mixer installation — mixing equipment with pre-mixed back-up system
Gas mixing equipment installed complete with a pre-mixed back-up supply system.
Cleanroom gas supply piping — N₂, O₂, helium and mixed gas
Gas supply piping installation at cleanroom for nitrogen, oxygen, helium and mixed gas service.
MIP equipment facilitation — gas supply piping
Gas supply piping for MIP equipment facilitation at Analog Devices.
Plant & process piping
Industrial gas plants, cryogenic pipeline, chemical, food and beverage, ducting and fire protection.
N₂ plant mechanical piping works
Mechanical piping for a nitrogen generation plant.
Vacuum insulated pipeline (VIP) installation
Vacuum insulated pipeline installed for cryogenic liquid service.
Piping works — CIP line
Clean-in-place line piping works for a food and beverage facility.
Piping works — simple syrup line
Simple syrup line piping works.
Chemical piping installation
Chemical service piping installation.
Ducting installation
Ducting fabrication and installation.
Fire protection pipeline with fire hose cabinet installation
Fire protection pipeline installed complete with fire hose cabinets at Ingasco CPIP.
Electrical, civil & purging
Supporting scope delivered alongside the mechanical package.
Cable pulling and equipment positioning
Cable pulling and positioning of electrical equipment on plant projects.
Line tracing and termination
Circuit line tracing and cable termination.
Tank foundation and erection
Foundation works and tank erection.
Four-storey dormitory building — civil and steel structure
Civil and steel structural works for a four-storey dormitory building.
N₂ gas purging activity
Nitrogen purging of process lines and vessels.
Project list — past three years
Grouped by the principal contractor or plant owner under which the work was delivered. Entries marked on-going were active at the time of the last company profile update.
Under Air Liquide Philippines Inc.
- SunPower Fab 2 tool install
- Purefoods Gentri — N₂ supply & VL pipe
- Ampleon — N₂ supply and gas mix
- Microchip — N₂ supply and gas mix
- STMicro — N₂ supply and gas mix
- ALPI — N₂ process line at Batino plant
- ALPlus — installation of N₂ gas blanketing line to oil expansion tank (on-going)
- ALPI — installation of auto-switchover manifold for argon gas
- Re-routing of N₂ product pipeline with polyurethane
- Installation of P2K pump — N₂ LGC refilling
- N₂/H₂ gas mixer and supply piping, including bulk N₂ supply facility (mechanical piping works)
Under Ingasco Philippines / Nippon Sanso
- Amkor Anam Plant 2, Laguna — N₂ plant
- Murata — N₂ plant and electrical
- IMI Laguna — O₂ supply line and N₂
- Team Quest — N₂ supply and mixed gas
- Nexperia — N₂ supply and electrical
- Allegro Bicutan — electrical project
- San Miguel Pampanga — N₂ VJP line
- Murata — N₂ Plant 2 project (on-going)
- onsemi — N₂ back-up supply system (on-going)
- onsemi — GaN1200 NGU project, Phase II
- NSI CPIP — fire protection pipeline with fire hose cabinet (on-going)
- Coherent — installation of pipeline for VIE tank and vaporisers
- N₂ gas plant 2 expansion project, mechanical piping — Murata, FPIP Sto. Tomas, Batangas
- GaN1200 nitrogen generator plant — onsemi, Carmona, Cavite
SunPower / Maxeon
- All tool hook-up of Fab 4 for all gases — N₂, H₂, Ar, NH₃, B₂H₆, NF₃, PH₃, O₂, H₂O and He
- Base build and hook-up of MAXEON 7 and MAXEON 8 (on-going)
Microchip
- Microchip 3 — Phases 1, 2 and 3 tool hook-up for gases (hydrogen, forming gas and nitrogen)
Major customers
- Coherent
- Air Liquide Philippines Inc.
- Nippon Sanso — Ingasco Philippines
- Microchip
- Maxeon
Want references or a detailed scope sheet?
We can supply project references, method statements and testing records on request.